This commercial grade solar power system QCS installed for Gold Coast Labs. The 60kw system with 55.2kw inverters, 240 solar panels and zero export device including web-based system monitoring was a substanial undertaking and we were extremely happy with the success of the project.This Gold Coast solar system is producing 93.44MWH/year and saving Gold Coast Laboratories $16,800/year.
Gold Coast Labs has been in business since 1997 and was recently looking at ways to reduce bottom line business expenditure through reduced electricity costs. Running laboratory equipment can have a high drain on power so it made sense for the Gold Coast Labs management to engage in an cost reduction assessment of their energy usage. Once this was completed QCS provided our plan for the system and had the job completed in no time.